Nigeria's Energy Problem Is Solved at the Enterprise Level — and This Is How
74kWp Solar · 50kVA Hybrid Inverter · 112kWh LiFePO₄ Battery · ₦59.4M | EaaS Available
Ideal For
Large corporate or institutional site — estate, hotel, hospital, or commercial campus in Lagos or Abuja
Office tower, bank headquarters, or large corporate campus in Lagos or Abuja
Residential estate or gated community powering shared infrastructure, pumping stations, and perimeter security
Large hotel (50+ rooms) with full commercial kitchen, pool, laundry, and conference facilities
Manufacturing facility, pharmaceutical plant, or regulated cold chain warehouse
Institutional client seeking Energy-as-a-Service (EaaS) — zero capex, fixed monthly energy tariff, InfraSol owns and maintains the asset
What This System Powers
12–15 units (1.5HP) simultaneously, or 6–8 commercial 3-phase units
InfraSol conducts a full load profile audit and demand-side analysis before system design at this scale. The 74kWp array generates 318kWh daily — enough to run a medium hotel's full HVAC load through the working day.
Large-scale commercial cold storage and cold chain — continuously
Full enterprise campus including outdoor, perimeter, and emergency lighting
All
100+ devices, workstations, and servers
Multiple pumps up to 5HP simultaneously
Industrial laundry — yes
3-phase motor loads and harmonic-heavy equipment must be reviewed by InfraSol engineer. Site survey and load audit are mandatory at this scale.
Configurable for peak shaving, grid-tie with export, or full island mode. InfraSol remote monitoring standard: live dashboards, automated fault alerts, monthly energy intelligence reports. EaaS financing available for qualifying institutional clients — zero upfront capital, fixed monthly energy tariff.
Battery Autonomy
Overnight Scenario
112kWh at reduced overnight load (15kW: security, CCTV, cold storage, 3–4 ACs) delivers 6.7 hours of backup — combined with typical Lagos grid windows, this is effectively 24/7 power. The 318kWh daily solar harvest recharges to full by early afternoon.
System Specifications
| Solar Array | 74 kWp |
| Panel Brand | Jinko Solar Monocrystalline (Tier-1) |
| Inverter | 50 kVA Hybrid |
| Inverter Brands | Deye, SRNE |
| Battery Capacity | 112 kWh |
| Battery Chemistry | LiFePO₄ |
| Battery Cycle Life | 6,000–8,000 cycles (~15 year lifespan) |
| Usable Battery Capacity | 100.8 kWh |
| Daily Solar Generation | 318.2 kWh |
| Monthly Generation | 9546 kWh |
| Solar Utilisation | 91% |
| Monitoring | InfraSol real-time remote monitoring platform |
Financial Payback
Conservative (₦310/kWh blended avoided cost): customer in Band A/B area with 14–18hrs PHCN daily, moderate daytime loads. Base case (₦440/kWh): typical Band B/C Lagos customer, ~10hrs PHCN, 14hrs diesel, standard usage mix. Optimistic (₦490/kWh): Band C/D customer with heavy daytime operational loads and minimal grid supply. Diesel costed at ₦1,700/litre ÷ 2.6 kWh/litre practical gen efficiency = ₦654/kWh. Grid at ₦220/kWh (Band A reference rate). The more your consumption is concentrated during daylight hours, the faster the payback.
The Diesel Reality
Enterprise sites in Lagos running 60–100kVA generators 14+ hours daily burn 7,000–10,000 litres per month. At ₦1,700/litre, that is ₦11.9M–₦17M per month — before fuel logistics, generator operators, servicing contracts, capital depreciation, and the regulatory exposure of on-site bulk diesel storage tanks. At enterprise scale, solar is not just an energy decision. It is a balance sheet decision. Ask about InfraSol's EaaS structure for zero-capex energy supply.
Already on Band A?
Even with a favourable grid tariff, solar eliminates diesel dependency for daytime operations and provides the energy intelligence layer — real-time data, consumption analytics, and automated reporting — that enterprise finance and ESG teams need.
Real-Time Remote Monitoring
Every InfraSol Enterprise 74 includes InfraSol's real-time remote monitoring platform. Track solar generation, battery state-of-charge, grid usage, and system health from your phone — 24/7. Automated fault alerts and monthly energy intelligence reports included.
Learn more about our monitoringReady to eliminate your diesel costs?
Get a free site assessment and see exactly what the InfraSol Enterprise 74 would save you every month.
Also available via Lease-to-Own (30–40% down, 3–5 months) or Uptime as a Service (flat monthly fee). View financing options