All Packages
    EnterpriseInfraSol Enterprise 74

    Nigeria's Energy Problem Is Solved at the Enterprise Level — and This Is How

    74kWp Solar · 50kVA Hybrid Inverter · 112kWh LiFePO₄ Battery · ₦59.4M | EaaS Available

    74 kWp
    Solar Array
    50 kVA
    Inverter
    112 kWh LiFePO₄
    Battery
    318.2 kWh
    Daily Generation
    ₦59.4M
    Price

    Ideal For

    Large corporate or institutional site — estate, hotel, hospital, or commercial campus in Lagos or Abuja

    Office tower, bank headquarters, or large corporate campus in Lagos or Abuja

    Residential estate or gated community powering shared infrastructure, pumping stations, and perimeter security

    Large hotel (50+ rooms) with full commercial kitchen, pool, laundry, and conference facilities

    Manufacturing facility, pharmaceutical plant, or regulated cold chain warehouse

    Institutional client seeking Energy-as-a-Service (EaaS) — zero capex, fixed monthly energy tariff, InfraSol owns and maintains the asset

    What This System Powers

    Air Conditioning

    12–15 units (1.5HP) simultaneously, or 6–8 commercial 3-phase units

    InfraSol conducts a full load profile audit and demand-side analysis before system design at this scale. The 74kWp array generates 318kWh daily — enough to run a medium hotel's full HVAC load through the working day.

    Refrigeration

    Large-scale commercial cold storage and cold chain — continuously

    Lighting

    Full enterprise campus including outdoor, perimeter, and emergency lighting

    Fans

    All

    Entertainment & Devices

    100+ devices, workstations, and servers

    Water Pump

    Multiple pumps up to 5HP simultaneously

    Washing Machine

    Industrial laundry — yes

    Not Recommended

    3-phase motor loads and harmonic-heavy equipment must be reviewed by InfraSol engineer. Site survey and load audit are mandatory at this scale.

    Configurable for peak shaving, grid-tie with export, or full island mode. InfraSol remote monitoring standard: live dashboards, automated fault alerts, monthly energy intelligence reports. EaaS financing available for qualifying institutional clients — zero upfront capital, fixed monthly energy tariff.

    Battery Autonomy

    100.8 kWh
    Usable Capacity
    4 hrs
    at 25kW (8 ACs + full daytime commercial load)
    2.7 hrs
    at 37.5kW (12 ACs + full enterprise load)

    Overnight Scenario

    112kWh at reduced overnight load (15kW: security, CCTV, cold storage, 3–4 ACs) delivers 6.7 hours of backup — combined with typical Lagos grid windows, this is effectively 24/7 power. The 318kWh daily solar harvest recharges to full by early afternoon.

    System Specifications

    Solar Array74 kWp
    Panel BrandJinko Solar Monocrystalline (Tier-1)
    Inverter50 kVA Hybrid
    Inverter BrandsDeye, SRNE
    Battery Capacity112 kWh
    Battery ChemistryLiFePO₄
    Battery Cycle Life6,000–8,000 cycles (~15 year lifespan)
    Usable Battery Capacity100.8 kWh
    Daily Solar Generation318.2 kWh
    Monthly Generation9546 kWh
    Solar Utilisation91%
    MonitoringInfraSol real-time remote monitoring platform

    Financial Payback

    Conservative
    ₦2,697,000
    saved/month
    1.8 years
    payback
    Base Case
    ₦3,828,000
    saved/month
    1.3 years
    payback
    Optimistic
    ₦4,263,000
    saved/month
    1.4 years
    payback

    Conservative (₦310/kWh blended avoided cost): customer in Band A/B area with 14–18hrs PHCN daily, moderate daytime loads. Base case (₦440/kWh): typical Band B/C Lagos customer, ~10hrs PHCN, 14hrs diesel, standard usage mix. Optimistic (₦490/kWh): Band C/D customer with heavy daytime operational loads and minimal grid supply. Diesel costed at ₦1,700/litre ÷ 2.6 kWh/litre practical gen efficiency = ₦654/kWh. Grid at ₦220/kWh (Band A reference rate). The more your consumption is concentrated during daylight hours, the faster the payback.

    The Diesel Reality

    Enterprise sites in Lagos running 60–100kVA generators 14+ hours daily burn 7,000–10,000 litres per month. At ₦1,700/litre, that is ₦11.9M–₦17M per month — before fuel logistics, generator operators, servicing contracts, capital depreciation, and the regulatory exposure of on-site bulk diesel storage tanks. At enterprise scale, solar is not just an energy decision. It is a balance sheet decision. Ask about InfraSol's EaaS structure for zero-capex energy supply.

    Already on Band A?

    Even with a favourable grid tariff, solar eliminates diesel dependency for daytime operations and provides the energy intelligence layer — real-time data, consumption analytics, and automated reporting — that enterprise finance and ESG teams need.

    Real-Time Remote Monitoring

    Every InfraSol Enterprise 74 includes InfraSol's real-time remote monitoring platform. Track solar generation, battery state-of-charge, grid usage, and system health from your phone — 24/7. Automated fault alerts and monthly energy intelligence reports included.

    Learn more about our monitoring

    Ready to eliminate your diesel costs?

    Get a free site assessment and see exactly what the InfraSol Enterprise 74 would save you every month.

    Also available via Lease-to-Own (30–40% down, 3–5 months) or Uptime as a Service (flat monthly fee). View financing options