InsightsCost & ROISeptember 20269 min read

    Energy as a Service in Nigeria: Solar With No Upfront Cost

    For commercial sites with daytime load, Energy as a Service removes the capital barrier that keeps generators running. Here is what it costs, what it includes, and the full economics at current Lagos diesel and grid availability.

    By InfraSol Research · Updated 4 October 2026

    Almost every Lagos business that looks seriously at solar reaches the same wall. The diesel comes out of this month’s revenue. The system wants fifteen million naira in one payment. The arithmetic is obvious, the capital is not, and so the generator keeps running for another year. Energy as a Service exists for exactly that gap, and for daytime commercial loads it is the structure that fits best.

    What energy as a service means

    Under an Energy as a Service agreement you never buy the system. The provider funds it, installs it, owns it, monitors it and maintains it. You pay a monthly bill for the power, exactly as you pay for diesel today, except the bill is 50–60% of what you currently spend and it is lower from the very first month.

    There is no deposit, no procurement cycle, no maintenance contract to negotiate separately, and no capital sitting on your balance sheet depreciating. If an inverter fails in year five, it is our problem and our cost.

    No upfront cost. You pay 50–60% of your current energy bill from month one. A seven-year contract, with escalation indexed to inflation so the saving holds in real terms rather than eroding.

    Why this fits commercial and daytime loads

    This is the part most coverage of EaaS skips, and it decides whether the model works for you at all. Solar produces during daylight hours. A business that runs from eight in the morning until six in the evening consumes at almost exactly the hours the array is generating, so most of what the panels make is used the moment it is made, rather than cycled through a battery and returned at a loss.

    That single fact drives everything. A daytime commercial load needs proportionally less battery per kilowatt-hour served, wastes less energy to round-trip losses, and extracts more value from every panel on the roof. A household with the same annual consumption draws most of it after sunset, which means a bigger battery, more losses and worse economics.

    • Offices, clinics, schools, retail, light industry: load concentrated in working hours, which is when generation peaks.
    • Sites already running a generator through the working day: the most expensive electricity anyone buys, replaced by the cheapest.
    • Businesses where downtime has a cost that is measured in lost trading rather than inconvenience.

    What you are actually buying: uptime

    The name matters. The contract is not for a solar system, it is for power during your working day. Meeting that promise is an operational commitment, not a hardware one, and it is why the system stays ours to run:

    • Remote monitoring on every installation. We see generation, battery state and consumption continuously, so a degrading string or a failing cell surfaces as a maintenance visit rather than as your lights going out.
    • Grid forecasting. Lagos grid availability is predictable enough to plan around. Knowing when supply is likely to drop means the battery can be held at the right state of charge going into it, instead of being caught low.
    • Maintenance included for the life of the contract. Cleaning, servicing, replacement, all of it.
    • We carry the failure risk. Equipment that fails is equipment we replace, and our revenue depends on it working.

    What Lagos power actually costs right now

    The bill is calculated off your current blended cost, so that number has to be honest. Two things set it: the price of diesel, and how much of the time the grid is actually there.

    With diesel at ₦1,900–₦2,000 a litre, a well-maintained generator produces electricity at roughly ₦607–₦702 per kilowatt-hour in fuel alone. Servicing, overhaul, managed-power premiums and diesel theft add another ₦60–₦120, so generator power costs ₦700–₦790 per kilowatt-hour all-in. Band A grid power costs ₦210. Most commercial sites in Lagos see the grid somewhere between 40% and 60% of the time, and burn diesel for the rest.

    Blended cost per kWh, by how often the grid shows up

    • Grid 60% of the time: 0.60 × ₦210 + 0.40 × ₦697–792 = ₦405–₦443/kWh
    • Grid 50% of the time: 0.50 × ₦210 + 0.50 × ₦697–792 = ₦453–₦501/kWh
    • Grid 40% of the time: 0.40 × ₦210 + 0.60 × ₦697–792 = ₦502–₦559/kWh

    A typical Lagos commercial site pays ₦405–₦559 per kWh across grid and generator combined.

    The worse your grid, the more of your energy comes from the most expensive source you have, and the more a service agreement is worth to you. Sites with the least reliable supply benefit most.

    A worked example

    Take a commercial site consuming 65 kWh a day: a mid-sized office, a clinic, a busy retail unit. Grid roughly half the time, generator the rest, at the central blended rate of ₦471 per kWh.

    InfraSol Commercial 20: 20kWp solar, 20kVA inverter, 30kWh battery

    • Today: 65 kWh/day × 30.4 × ₦471 = ₦931,000 per month
    • New bill: ₦931,000 × 50–60% = ₦465,000–₦558,000 per month
    • Saved: ₦372,000–₦465,000 per month

    ₦4.47M–₦5.58M saved in the first year, with no capital outlay whatsoever.

    ₦0

    Capital required to start saving ₦372,000–₦465,000 a month

    Across the seven-year term

    Both your diesel bill and the service fee rise with inflation, which is the point of indexing: the gap holds in real terms instead of quietly closing. Below, the same site over the full contract, at three inflation assumptions.

    Cumulative seven-year cost for a 65 kWh/day commercial site, at the 55% midpoint of the fee band. Service fee and do-nothing diesel costs both indexed to the same inflation rate.
    InflationService, 7 yrsDo nothing, 7 yrsYou save
    10% a year₦58.3M₦106.0M₦47.7M
    15% a year₦68.0M₦123.6M₦55.6M
    20% a year₦79.3M₦144.2M₦64.9M
    Cumulative seven-year cost for a 65 kWh/day commercial site, at the 55% midpoint of the fee band. Service fee and do-nothing diesel costs both indexed to the same inflation rate.

    Because both sides are indexed, the proportion holds while the absolute gap widens every year diesel moves. The saving rises as inflation rises, because a fixed share of a bigger number is a bigger number. A business that keeps its generator is not holding costs steady. It is holding a position that gets worse every year diesel moves.

    Worth being honest about: If you have the capital, buying the system outright is cheaper over seven years, materially so. The same site that pays ₦58M in service fees at 10% inflation would spend around ₦26M owning the system and drawing what little it still needs from the grid. A service agreement is not the cheapest way to get solar. It is the cheapest way to get solar without capital, and for most Lagos businesses that is the only comparison that is actually available to them.

    Who should take which

    Take the service agreement if

    • You cannot or will not commit eight figures of capital to a roof.
    • Your capital earns more inside the business than the roughly 25% a year that owning a system returns.
    • You rent, and cannot justify fixing an asset to a building you may leave.
    • You want the equipment risk and the maintenance burden to sit with someone whose revenue depends on the system running.

    Buy outright or lease-to-own if

    • You have capital that is not working harder elsewhere. Payback on purchase runs one to two years on most commercial sites.
    • You own the building and intend to stay in it.
    • You want the asset on your balance sheet rather than a recurring obligation against it.

    The comparison most businesses are actually making

    The argument between funding structures obscures the column that dwarfs all of them. Seven years of the status quo costs this site between ₦106M and ₦144M, depending on where diesel goes. Every route out of that (service agreement, lease, outright purchase) is better than the road you are already on.

    The expensive decision is not picking the wrong structure. It is spending another year running the generator while deciding. If you want the arithmetic behind that ₦106M, we set out what a generator truly costs per kilowatt-hour in solar versus generator in Lagos, and how to size a system against a real load in what size solar system you need.

    Sources

    Frequently Asked Questions

    Get a Free Energy Cost Audit

    Tell us your monthly energy spend and we’ll show you your optimal system size, savings, and payback timeline.