All Packages
    EnterpriseInfraSol Business 72

    Our Largest Standard System, for Sites That Run All Day

    73.2kWp Solar · 6 × SRNE 12kW hybrid · 180kWh LiFePO₄ · ₦67M, or from ₦57.8M

    73.2 kWp
    Solar Array
    72 kVA
    Inverter
    180 kWh LiFePO₄
    Battery
    262.7 kWh
    Daily Generation
    ₦57.8M
    Price from

    Two ways to buy this system

    Both use the same inverters. The cheaper version has less battery and fewer panels, and you can add to it later without changing anything else.

    Cheaper version
    ₦57,830,000
    or ₦17,349,000 down and 3 payments of ₦14,311,263
    • 59.5 kWp of solar (96 panels)
    • 150 kWh battery, about 7.5 hours at 18 kW overnight
    • Payback 1.3–2.3 years
    • Add 22 panels and a sixth 30kWh pack later.
    Get a quote for this version
    Full system
    ₦66,953,000
    or ₦20,085,900 down and 3 payments of ₦16,568,943
    • 73.2 kWp of solar (118 panels)
    • 180 kWh battery, about 9 hours at 18 kW overnight
    • Payback 1.3–2.1 years
    Get a quote for this version

    Installed prices for an outright purchase, as of October 2026. Product photos show the equipment used; the counts are on each picture.

    Ideal For

    Large hotel, light manufacturing or estate common services on a three-phase supply

    Hotel with 40 or more rooms, a pool, kitchen and laundry

    Light manufacturing or packaging with daytime production

    Residential estate powering pumps, gatehouses and street lighting

    Institutional client looking at Energy as a Service: no upfront capital, a fixed monthly tariff

    What This System Powers

    Air Conditioning

    20 or more units, or 6–8 commercial units

    Six inverters, two per phase, keep a three-phase site balanced.

    Refrigeration

    Large-scale cold storage around the clock

    Lighting

    Full site lighting including perimeter and street lighting

    Fans

    All

    Entertainment & Devices

    100 or more devices, workstations and servers

    Water Pump

    Multiple pumps up to 5HP

    Washing Machine

    Industrial laundry: yes, within the inverter rating

    Not Recommended

    Large motor and harmonic-heavy loads must be reviewed by an InfraSol engineer. Site survey and load audit required. Above 72kVA we design high-voltage systems individually.

    Battery Autonomy

    162 kWh
    Usable Capacity
    4.5 hrs
    at 36kW (the working day's cooling and equipment)
    3 hrs
    at 54kW (the full site load)

    Overnight Scenario

    At a typical night-time load of 18kW (security, cold storage, pumps and occupied areas), the 180kWh battery runs for about 9 hours. The cheaper version's 150kWh runs for about 7.5 hours.

    System Specifications

    Solar Array73.2 kWp
    Panels118 × Jinko Tiger Neo 620W N-type panel
    Inverter72 kVA: 6 × SRNE 12kW hybrid
    PhaseThree-phase (two inverters per phase), or single-phase
    Battery Capacity180 kWh: 6 × Aurora 30kWh LiFePO₄
    Battery ChemistryLiFePO₄
    Battery Cycle Life7-year warranty, over 6,000 cycles at 90% depth of discharge
    Usable Battery Capacity162 kWh
    Daily Solar Generation262.7 kWh
    Monthly Generation7881 kWh
    Solar Utilisation90%
    Roof Space NeededAbout 330 m²
    MonitoringInfraSol real-time remote monitoring platform

    Financial Payback

    Conservative
    ₦2,599,000
    saved/month
    2.1 years
    payback
    Base Case
    ₦3,766,000
    saved/month
    1.5 years
    payback
    Optimistic
    ₦4,434,000
    saved/month
    1.3 years
    payback

    Savings are the solar energy a system produces and the customer uses, valued at what that energy costs them today. Output is 1,310kWh per kWp a year, the Lagos figure for a well-oriented, unshaded array after system losses; we count 75% of it as used in homes and 90% in businesses, and give the battery no credit for charging from the grid, so the payback is conservative. Generator fuel is derived rather than assumed: litres/hour ≈ 0.25 × kW drawn + 0.037 × rated kVA, at ₦1,920/litre. The second term is fixed burn proportional to the set's size whether or not anything is plugged in, which is why an oversized generator costs more per kWh than one that is worked hard. Most Lagos generators run at 40–70% of rating; across that band fuel alone costs ₦607–₦702/kWh on a well-maintained engine, about ₦640/kWh at a typical 55% load, and around ₦800/kWh on a worn, lightly loaded one. Servicing, overhaul, managed-power premiums and diesel theft add another ₦60–₦120/kWh, which is what takes generator power past ₦700/kWh all-in. Band A grid is taken at ₦210/kWh. Conservative (₦366/kWh blended avoided cost): Band A home, 14–18 hours of mains, load weighted to the evening. Base case (₦531/kWh): Band B/C small business, roughly 10 hours of mains, mid-life generator. Optimistic (₦625/kWh): Band C/D commercial site with minimal grid and heavy daytime load. The more of your consumption falls in daylight hours, the faster the payback.

    The Diesel Reality

    A 80kVA generator running 16 hours a day burns roughly 4,490–6,800 litres of diesel a month, depending on how hard it is worked. At ₦1,920 a litre that is ₦8.6M–₦13.1M a month in fuel alone, before servicing, oil changes and the diesel that goes missing. Ask about Energy as a Service for a zero-capex supply.

    Already on Band A?

    Band A businesses still benefit. The array carries daytime operations, when a business draws most of its power, and the battery covers outages and the evening tail instead of the generator. Charged from Band A mains, stored energy costs about ₦239/kWh against ₦640/kWh or more from diesel.

    Real-Time Remote Monitoring

    Every InfraSol Business 72 includes InfraSol's real-time remote monitoring platform. Track solar generation, battery state-of-charge, grid usage, and system health from your phone, 24/7. Automated fault alerts and monthly energy intelligence reports included.

    Learn more about our monitoring

    Ready to eliminate your diesel costs?

    Get a free site assessment and see exactly what the InfraSol Business 72 would save you every month.

    Also available via Lease-to-Own (30% down, then 3 monthly payments) or Energy as a Service (flat monthly fee). View financing options