Whole-Duplex or Whole-Office Power on Two Inverters
Lite ₦13.9M · Pro ₦18.6M · Max ₦20M
Compare every 20kVA system and price



32 panels2 × 10kW4 × 15kWhThree ways to buy the InfraSol 20kVA
Lite is the cheapest way in. Pro adds battery. Max adds panels. You can add panels and battery later.




24 panels2 × 10kW2 × 15kWh- 2 × SRNE 10kW hybrid
- 14.9 kWp of solar (24 panels)
- 30 kWh battery, about 6.8 hours at 4 kW overnight
- Payback 1.4–2.5 years
- For an office with 4 ACs, a clinic or lab, or a 4-bedroom duplex: two SRNE 10kW in parallel, 24 panels and 30kWh.




24 panels2 × 10kW4 × 15kWh- 2 × SRNE 10kW hybrid
- 14.9 kWp of solar (24 panels)
- 60 kWh battery, about 13.5 hours at 4 kW overnight
- Payback 1.9–3.3 years
- For a 5-bedroom duplex with 6 ACs: Lite plus two more 15kWh packs (60kWh), so 3–4 ACs run through the night.




32 panels2 × 10kW4 × 15kWh- 2 × SRNE 10kW hybrid
- 19.8 kWp of solar (32 panels)
- 60 kWh battery, about 13.5 hours at 4 kW overnight
- Payback 1.6–2.7 years
- For a home with 8 ACs or a restaurant open late: Pro's 60kWh with 8 more panels for heavy daytime use and cloudy days.
Installed prices for an outright purchase, as of November 2026. Product photos show the equipment used; the counts are on each picture.
Ideal For
Duplex with 4–8 ACs, office of 15–25 staff, clinic or lab, replacing a 15–25kVA generator
Office of 15–25 staff with 4 ACs, spending ₦520–660k a month on fuel and NEPA (Lite)
Clinic or lab with a 24-hour load (Lite, or Pro on a poor grid)
5-bedroom duplex with 6 ACs, spending about ₦760–780k a month (Pro)
Large home with 8 ACs, or a restaurant or bakery open late (Max)
Household or business replacing a 15–25kVA generator
What This System Powers
4–6 units (1.5HP) together in the day; 2 at night on Lite, 3–4 on Pro and Max
Two inverters in parallel share the load, and the array serves daytime cooling directly.
2 fridges and 2 freezers around the clock
Full property lighting including outdoor and security lights
All
Whole-house TVs, laptops and network equipment, or 15–25 workstations
1–1.5HP borehole pump: yes
Yes, several loads a day
Three-phase motors or welding equipment. Two inverters cannot be split evenly across three phases; a three-phase site needs the 30kVA.
Battery Autonomy
Overnight Scenario
At a typical night-time load of 4kW (2 ACs, fridges and security lights), Lite's 30kWh runs for about 6.8 hours, Pro's 60kWh runs for about 13.5 hours and Max's 60kWh runs for about 13.5 hours.
Watch a Day on This System
The 20kVA in 3D, hour by hour, with NEPA off all day. Watch the sun charge the battery, the battery carry the night, and see when, if ever, the generator has to start. Pick a kind of day to see how it copes when the sun is weak.
System Specifications
| Solar Array | 19.8 kWp |
| Panels | 32 × Jinko Tiger Neo 620W N-type panel |
| Inverter | 20 kVA: 2 × SRNE 10kW hybrid |
| Phase | Single-phase |
| Battery Capacity | 60 kWh: 4 × Aurora 15kWh LiFePO₄ |
| Battery Chemistry | LiFePO₄ |
| Battery Cycle Life | 7-year warranty, over 6,000 cycles at 90% depth of discharge |
| Usable Battery Capacity | 54 kWh |
| Daily Solar Generation | 75.8 kWh |
| Monthly Generation | 2274 kWh |
| Solar Utilisation | 75% |
| Roof Space Needed | About 90 m² |
| Monitoring | InfraSol real-time remote monitoring platform |
Financial Payback
Savings are the solar energy a system produces and the customer uses, valued at what that energy costs them today. Output is 1,397kWh per kWp a year, the Lagos figure for a well-oriented, unshaded array after system losses; we count 75% of it as used in homes and 90% in businesses, and give the battery no credit for charging from the grid, so the payback is conservative. Generator fuel is derived rather than assumed: litres/hour ≈ 0.25 × kW drawn + 0.037 × rated kVA, at ₦1,920/litre. The second term is fixed burn proportional to the set's size whether or not anything is plugged in, which is why an oversized generator costs more per kWh than one that is worked hard. Most Lagos generators run at 40–70% of rating; across that band fuel alone costs ₦607–₦702/kWh on a well-maintained engine, about ₦640/kWh at a typical 55% load, and around ₦800/kWh on a worn, lightly loaded one. Servicing, overhaul, managed-power premiums and diesel theft add another ₦60–₦120/kWh, which is what takes generator power past ₦700/kWh all-in. Band A grid is taken at ₦210/kWh. Conservative (₦366/kWh blended avoided cost): Band A home, 14–18 hours of mains, load weighted to the evening. Base case (₦531/kWh): Band B/C small business, roughly 10 hours of mains, mid-life generator. Optimistic (₦625/kWh): Band C/D commercial site with minimal grid and heavy daytime load. The more of your consumption falls in daylight hours, the faster the payback.
The Diesel Reality
A 20kVA generator running 10 hours a day burns roughly 700–1,060 litres of diesel a month, depending on how hard it is worked. At ₦1,920 a litre that is ₦1.3M–₦2.0M a month in fuel alone, before servicing, oil changes and the diesel that goes missing. This system carries the day on solar and the evening on battery.
Already on Band A?
Band A customers on ₦210/kWh still benefit, and not only from the panels. Cheap mains is still worth storing: charged from the grid, the battery delivers energy at ₦239/kWh after round-trip losses, against ₦640–₦675/kWh in generator fuel alone, and more once servicing and theft are counted. The battery is an asset whether or not the sun is out. It arbitrages your cheapest supply against your most expensive one, and it removes diesel from overnight loads regardless of your tariff band.
Real-Time Remote Monitoring
Every InfraSol 20kVA includes InfraSol's real-time remote monitoring platform. Track solar generation, battery state-of-charge, grid usage, and system health from your phone, 24/7. Automated fault alerts and monthly energy intelligence reports included.
Learn more about our monitoringReady to eliminate your diesel costs?
Get a free site assessment and see exactly what the InfraSol 20kVA would save you every month.
Also available via Lease-to-Own (30–40% down, then 3, 6 or 12 monthly payments) or Energy as a Service (flat monthly fee). View financing options