Commercial Solar With the Battery Depth to Work Through the Night
30kWp Solar · 30kVA Hybrid Inverter · 45kWh LiFePO₄ Battery · ₦20.8M
Ideal For
Large Lagos commercial site with evening operations requiring extended post-sunset backup
Large hotel or hospitality property with evening F&B and overnight guest comfort requirements
Private hospital with overnight wards and continuous refrigeration
Office campus or large co-working space operating from 7am to 10pm
Retail anchor tenant or supermarket with extended trading hours
Any large commercial site where asking 'did you check the diesel level?' needs to stop
What This System Powers
6–8 units during the day; 4–5 sustained into the evening on battery
45kWh adds 2–3 hours of meaningful full-load evening coverage vs the 30kWh variant — the right choice for any business closing at 9–10pm.
Full commercial cold chain — continuous
Full commercial property
All
40–50 devices
2–3HP — yes
Industrial — yes
Confirm large 3-phase motor loads with InfraSol engineer before installation.
Battery Autonomy
Overnight Scenario
45kWh at evening commercial load (10–12kW: 3 ACs + CCTV + cold storage + lights) gives 3.4–4 hours post-solar coverage — enough to close at 10pm on battery and not start the generator.
System Specifications
| Solar Array | 30 kWp |
| Panel Brand | Jinko Solar Monocrystalline (Tier-1) |
| Inverter | 30 kVA Hybrid |
| Inverter Brands | Deye, SRNE |
| Battery Capacity | 45 kWh |
| Battery Chemistry | LiFePO₄ |
| Battery Cycle Life | 6,000–8,000 cycles (~15 year lifespan) |
| Usable Battery Capacity | 40.5 kWh |
| Daily Solar Generation | 129 kWh |
| Monthly Generation | 3870 kWh |
| Solar Utilisation | 78% |
| Monitoring | InfraSol real-time remote monitoring platform |
Financial Payback
Conservative (₦310/kWh blended avoided cost): customer in Band A/B area with 14–18hrs PHCN daily, moderate daytime loads. Base case (₦440/kWh): typical Band B/C Lagos customer, ~10hrs PHCN, 14hrs diesel, standard usage mix. Optimistic (₦490/kWh): Band C/D customer with heavy daytime operational loads and minimal grid supply. Diesel costed at ₦1,700/litre ÷ 2.6 kWh/litre practical gen efficiency = ₦654/kWh. Grid at ₦220/kWh (Band A reference rate). The more your consumption is concentrated during daylight hours, the faster the payback.
The Diesel Reality
Sites running 30kVA generators 12 hours daily spend ₦2.9M–₦5.2M/month on diesel depending on load factor. At this scale, diesel management — ordering, storage, shrinkage, ops — is a full-time administrative burden. Eliminating it is as much an operational win as a financial one.
Already on Band A?
Band A commercial customers still benefit significantly — solar eliminates diesel for daytime operations entirely, and the battery removes the most expensive grid peak hours.
Real-Time Remote Monitoring
Every InfraSol Commercial 30 Plus includes InfraSol's real-time remote monitoring platform. Track solar generation, battery state-of-charge, grid usage, and system health from your phone — 24/7. Automated fault alerts and monthly energy intelligence reports included.
Learn more about our monitoringReady to eliminate your diesel costs?
Get a free site assessment and see exactly what the InfraSol Commercial 30 Plus would save you every month.
Also available via Lease-to-Own (30–40% down, 3–5 months) or Uptime as a Service (flat monthly fee). View financing options